Deliverable (number) | Deliverable name | Work package number | Short name of lead participant | Type | Dissemination level |
Delivery date
|
---|---|---|---|---|---|---|
D1.1 | Applications, Solution specifications | WP1 | Nokia | R | PU | M06 |
D1.2 | System architecture and specifications | WP1 | Nokia | R | Confidential | M09 |
D1.3 | Sub-System and interconnections specifications | WP1 | CEIT | R | Confidential | M12 |
D1.4 | Sub-System and interconnections specifications | WP1 | CEIT | R | Confidential | M18 |
D1.5 | Sub-System and interconnections specifications | WP1 | CEIT | R | Confidential | M24 |
D2.1 | Report on D-band radio front end design for beam steerable active antenna array |
WP2 |
ST
|
R | Confidential | M09 |
D2.2 | Report on innovative circuit architecture design for D-band radio front end critical blocks |
WP2 |
ST
|
R | Confidential | M12 |
D2.3 | First report on First report on D-band transceiver front end characterizations |
WP2 |
ST
|
R | Confidential | M19 |
D2.4 | First report on innovative circuit architecture tests |
WP2 | ST | R | Confidential | M24 |
D2.5 | Final report on D-band transceiver front end characterizations |
WP2 | ST | R | Confidential | M28 |
D2.6 | Final report on innovative circuit architecture tests |
WP2 | VTT | R | PU | M34 |
D3.1 | Report on Proposal for antenna array specifications |
WP2 |
VTT
|
R | Confidential | M04 |
D3.2 | Report on Antenna subarray design and test results |
WP2 | VTT | R | Confidential | M14 |
D3.3 | Report on Improvement of antenna array isolation using advanced methods |
WP2 | VTT | R | PU | M16 |
D3.4 | Report on Final antenna array design | WP3 | VTT | R | PU | M26 |
D3.5 | Report on Radome material measurement results for D-band |
WP3 | Premix | R | Confidential | M14 |
D3.6 | Report on Radome design for D-band antenna |
WP3 | Premix | R | Confidential | M24 |
D4.1 | Modem & BB and PAM Requirement Specifications |
WP3 | NOKIA | R | CO | M12 |
D4.2 | Modem core Test report | WP4 | HCL | R | Confidential | M28 |
D4.3 | PAM platform elementary Test report | WP4 | CEA | R | PU | M24 |
D4.4 | Integrated Transceiver Control unit Test Report |
WP4 | TTI | R | PU | M24 |
D4.5 | Integrated BB unit Test report | WP4 | NOKIA | R | PU | M24 |
D4.6 | Integrated BB and PAM final specification and test report |
WP4 | NOKIA | R | CO | M30 |
D4.7 | Evaluation of Advanced Modem features report |
WP4 | HCL | R | PU | M36 |
D5.1 | Mechanical design and thermal simulations analysis |
WP5 | GW | R | PU | M23 |
D5.2 | Availability of manufactured mechanics |
WP5 | GW | OTHER | Confidential | M26 |
D5.3 | Final integration and validation report | WP5 | GW | R | Confidential | M32 |
D6.1 | Design of testbed architecture and field trial spec. and planning |
WP6 | NOKIA | R | Confidential | M24 |
D6.2 | Test execution and validation report | WP6 | NOKIA | R | Confidential | M30 |
D6.3 | Field trial execution report | WP6 | TCELL | R | PU | M36 |
D7.1 | Electronic Platform | WP7 | UniPV | DEC | PU | M3 |
D7.2 | Dissemination Plan | WP7 | UniPV | R | PU | M12 M24 M36 |
D7.3 | Exploitation plan | WP7 | UniPV | R | PU | M12 M24 M36 |
D7.4 | Standardization activity | WP7 | UniPV | R | Confidential | M12 M24 M36 |
D8.1 | Project Management manual | WP8 | VTT | R | PU | M3 |
D8.2 | Project Quality Assurance Manual | WP8 | VTT | R | PU | M4 |
D8.3 | Knowledge Management Guide | WP8 | VTT | R | Confidential | M4 |
D8.4 | First year Annual Report | WP8 | VTT | R | Confidential | M12 |
D8.5 | Second year Annual Report | WP8 | VTT | R | Confidential | M24 |
D8.6 | Final Report | WP8 | VTT | R | PU | M36 |